Exploitation Permit (PE) 15179: A Targeted Gold Presence in Mwenga
Exploitation Permit, PE 15179 is a strategic gold permit located in Mwenga Territory, South Kivu. Comprising 3 squares, it is exclusively dedicated to gold exploitation. Although modest in size, its location strengthens our footprint in this key gold-producing region.
Administrative and Historical Background: This permit was converted from a Research Permit into an Exploitation Permit by Ministerial Decree No. 00238/CAB.MIN/MINES/01/2025 of May 2, 2025.
The original Research Permit 15179 had been granted on June 29, 2022, and was valid until June 28, 2027, pursuant to Ministerial Decree No. 00137/CAB.MIN/MINES/01/2022 of April 26, 2022.
Cadastral Details and Mapping: The PE 15179 documents below provides an extract of the mining cadastre map and the list of geographic coordinates for Title 15179.
The map illustrates the location of the 3 permit squares in Mwenga, showing their position relative to neighboring permits such as 15180, 15184, and 14559.
The 6 perimeter points are defined according to the WGS84 system. For example, Corner 1 is located at Longitude 28° 05′ 00” E and Latitude -03° 16′ 30” S.
INTERLACS’s Commitment: The management of this permit, despite its smaller scale, reflects INTERLACS’s commitment to exploiting mineral resources sustainably and responsibly, consistently ensuring the quality of its operations while fostering a culture of innovation and efficiency.